SafeWind

  • Increase font size
  • Default font size
  • Decrease font size

Welcome to the SafeWind Project


Multi-scale data assimilation, advanced wind modelling and forecasting with emphasis to extreme weather situations for a safe large-scale wind power integration

Project period: 1.9.2008-31.8.2012

The integration of wind generation into power systems is affected by uncertainties in forecasting the expected power output of wind farms. Misestimating of meteorological conditions or large forecasting errors are very costly for infrastructures and reduce the value of wind energy for end-users.

The state of the art in wind power forecasting focused so far on the "usual" operating conditions rather than on extreme events. Thus, the current wind forecasting technology presents several bottlenecks. End-users urge for dedicated approaches to reduce large prediction errors or predict extremes at local scale (gusts, shears) up to a European scale as extremes and forecast errors may propagate. Similar concerns arise from the fields of external conditions and resource assessment, where the aim is to minimize project failure.

The aim of this project is to substantially improve wind power predictability in challenging or extreme situations and at different temporal and spatial scales. Going beyond this, wind predictability is considered as a system design parameter linked to the resource assessment phase, where the aim is to take optimal decisions for the installation of a new wind farm.


Upcoming Project Workshops


  • SafeWind End-users Workshop, Fredericia, Denmark. 2 March 2012.
  • Project Final Workshop, Paris, France. 31 August 2012.

  •  

    FP7 logo

    Collaborative project funded by the European Commission under the 7th Framework Program, Theme 2007-2.3.2: Energy

    Grant Agreement N° 213740

    EU logo

     

    ANEMOS logo

    SafeWind is a project of the ANEMOS Consortium.